Project Vision

TheTheCaboCaboNegroNegroMaritimeMaritimeTerminalTerminalrepresentsrepresentsaastrategicstrategicportportinfrastructureinfrastructureprojectprojectininthetheStraitStraitofofMagellan,Magellan,designeddesignedtotoserveserveasasaakeykeylogisticslogisticsandandmaritimemaritimehubhubforforthethesouthernmostsouthernmostregionregionofofthetheworld.world.TheTheterminalterminalwillwillfacilitatefacilitatecargocargooperations,operations,supportsupportgreengreenhydrogenhydrogenprojects,projects,andandserveserveasasaagatewaygatewayforforAntarcticAntarcticoperations.operations.

Felipe Morales Peralta - Project Manager Compas Marine

Felipe Morales Peralta

General Manager
Terminal Maritimo Cabo Negro

Schedule Meeting
COMPAS Marine

Strategic Partner of the Port Project

CompasCompasMarineMarineisisthethepartnerpartnerresponsibleresponsibleforforthethemanagementmanagementandanddevelopmentdevelopmentofofthetheCaboCaboNegroNegroMaritimeMaritimeTerminal.Terminal.WithWithextensiveextensiveexperienceexperienceininthethedesign,design,construction,construction,operation,operation,andandadministrationadministrationofofmaritimemaritimeterminalsterminalsininChileanChileanPatagonia,Patagonia,thethecompanycompanybringsbringstechnicaltechnicalexpertise,expertise,high-levelhigh-leveloperationaloperationalstandards,standards,andandaasolidsolidfocusfocusononefficiency,efficiency,safety,safety,andandportportinnovation.innovation.TheirTheirparticipationparticipationensuresensuresdevelopmentdevelopmentalignedalignedwithwithindustryindustrybestbestpracticespracticesandandthethelogisticallogisticalandandenergyenergyneedsneedsofofthetheregion.region.

Port Advantages

Protected Port

Strategic location with natural protection

Backup Areas

Ample space for logistics operations

Route 9 Access

Direct connection to main transportation corridor

Project Timeline

Key milestones from 2021 to 2028

2021

2021

May: Beach line fixation•July: Maritime concession application
2021 Project Initiation2021 Maritime Concession

2022

2022

March: Admissibility processing CM61260•September: Oceanographic studies (UMAG)•November: Conglomerate and Technical Report
2022 Studies2022 Oceanographic Studies

2023

2023

January: Conceptual Engineering PRDW•May: Favorable pronouncement DIFROL
2023 Engineering2023 Pronouncements

2024

2024

June: Favorable cartographic report
2024 Cartographic Report2024 Report

2025

2025

April: Unanimous Approval CRUBC•April: Favorable pronouncement DOP•July: Favorable pronouncement MTT•August: Decree granting Maritime Concession
2025 Approvals2025 Concession

2026-2028

2026-2028

Environmental studies•RCA processing•Basic and detailed engineering•Maneuverability studies
2026-2028 Development2026-2028 Studies

2028

2028

Ready-to-Build (RtB)
2028 Ready to BuildCabo Negro Maritime Terminal
Cabo Negro Maritime Terminal